
Know what your home
project should really cost.
Free home report. Real local pricing. Real bids. Save THOUSANDS.
Bigger projects and repeat use often save tens of thousands.

Plumbing scope — pick the exact job.
Real project costs, down to the line item.
Not national averages. Not "starting at" bait. Permit-aware pricing from 30 California cities across the projects homeowners actually run.
A real report. Not a sales funnel.
Your TRUbee report is the same data a senior project manager would gather before quoting your job. Given to you first, in plain language.
- Property facts pulled from public records, not guessed.
- Realistic cost ranges for your zip, not a national average.
- Comparable projects nearby so you can sanity-check a bid.
- Permit fees, plan-check timing, and what your lot can actually support.
- Red flags in the bids you've already received, before you sign.
Sample report shown. The numbers in your report will reflect your address.
See a sample report- ·Bid #2 is 38% under the typical range. Ask what's not included.
- ·None of the bids list a soils-report line item. Your lot likely needs one.
- ·One bidder's CSLB shows a lapsed workers' comp policy — confirm before signing.
Likely Value Lift
Recent ADU sales in 91103
Plus 4 Free Tools to Plan Your Project.
Your free property report shows what's possible. These four tools help you plan it, price it, and pull the permits, without paying a consultant or chasing down a contractor first.
My Project
Build a real project plan in minutes
Turn your report into an actual plan. Answer one question at a time, pick finishes, and watch your live estimate update as you decide. Set a budget, save your work, and come back anytime. No contractor required.
- Live estimate as you pick finishes
- Budget tracking with line-item breakdowns
- Save, edit, and share with bidders

Cost Calculator
Avoid 20-40% budget overruns
City-specific construction cost estimates built from real project data. See breakdowns by project type, finish level, and square footage, plus the impact fees and soft costs most homeowners don't see coming.
- City-specific cost multipliers
- Impact & permit fee estimates
- ROI & payback calculator

Permit Timeline
Know how long it will actually take
Your city's exact permitting process, phase by phase. See plan check, corrections, and construction windows side by side, so you know when to break ground and when to plan around it.
- Phase-by-phase timeline (weeks, not guesses)
- Express & over-the-counter program alerts
- Building dept contacts & fees

Knowledge Bee
Skip $200-$500/hr consultant fees
Ask any construction question and get an instant, source-cited answer drawn from building codes, zoning rules, and real project experience, with context from your own property and project.
- Source-cited answers, not hallucinated guesses
- Aware of your property, project, and budget
- Unlimited follow-ups, full chat history

This Is Not ChatGPT With Your Address.
Anyone can paste their address into a chatbot. TRUbee is a purpose-built construction intelligence platform backed by real project data and licensed professionals.
Generic AI Chatbot
- ✕Scrapes generic internet averages for cost data
- ✕One general-purpose model guessing at everything
- ✕No access to your city's actual building codes
- ✕Can't verify if information is current or accurate
- ✕No connection to real construction professionals
TRUbee Intelligence
- Cost estimates from real projects we actively monitor
- Multiple specialized AI systems cross-referencing each other
- Research Bee reads your city's actual municipal codes
- Confidence scores and source citations on every answer
- Backed by vetted, licensed contractors in your area
Real Project Data
Our cost estimates come from actual construction projects TRUbee is managing and monitoring right now, not scraped web averages or outdated databases.
Purpose-Built AI Specialists
We don't ask one chatbot to do everything. Multiple specialized AI systems (our "Bees") each handle a specific domain and cross-reference for accuracy.
City Ordinance Research
Our Research Bee reads actual municipal codes, building department requirements, and city-specific regulations, adding new cities automatically as our community of homeowners grows.
Licensed Professionals
Our AI enhances the work of vetted, licensed contractors, making them more efficient, which directly translates to cost savings passed on to you.
Developer-Grade Intelligence
The same caliber of property analysis that professional real estate developers invest thousands in, now available to homeowners for free.
Owner's Rep Perspective
TRUbee is built and operated by an Owner's Representative firm. We protect homeowners, not sell you services. Our tools are designed to keep you informed and in control.
Get your free report today.
Join the growing community of homeowners getting straight answers about their property. No credit card. No obligation. Just intelligence.
- Instant AI property analysis
- Construction cost estimates from real data
- Permit timelines for your city
- Ask unlimited questions to Knowledge Bee


